Land at a competitive price.

GovDash analyzes the solicitation, builds a work breakdown, allocates labor hours, and produces a traceable cost estimate ready for Excel.

300+ teams have won billions with GovDash

A pricing workspace that streamlines your pursuits.

Pricer converts the solicitation into a structured, compliant, and fully traceable cost estimate. Your team aligns on every figure before the bid goes out.

Pricer reads the solicitation and builds your work breakdown.

Say goodbye to the blank spreadsheet. Start with the contract already organized into work packages, each with the labor categories, materials, and ODCs.

  • Work breakdown built from the solicitation
  • Inferred materials added automatically
  • Every AI proposal stays fully editable

Manage labor allocations from a baseline you control.

Pricer assigns labor categories to each work package and estimates hours across the full period of performance.

  • Hours estimated across the period of performance
  • Any category, hour, or assignment stays editable
  • Your judgment stays in control of the final estimate

Turn your rates into a traceable cost-to-government figure.

Pricer takes your wrap rates, applies them to the allocated hours, and builds the basis of estimates. Every dollar traces back to the RFP and your rates.

  • Direct rate, hours, and wrap combined into one figure
  • Every line traces back to a work package
  • Cost-to-government shown before profit, per FAR practice

Every figure is auditable and accessible to all stakeholders.

Pricer delivers defensible, audit-ready cost structure and collaborative pricing decisions for the entire team to review prior to submission.

Work breakdown from the RFPEvery package built from the solicitation, mapped back to its source.
Fully traceable cost buildEvery dollar traces back to a work package, a cost type, and a rate.
Built for the whole pursuit teamStakeholder-safe briefs and shared outputs for the rest of your team.

Every number traces back, and every stakeholder can see why.

Cost Types in the Basis of Estimates link every work package back to the solicitation. You build a defensible pricing and the rest of your team sees the why.

Pricing connects to every stage of the bid.

Pricer runs inside the same platform as capture, proposal, and contracts. Your work breakdown, hours, and rates flow into the CLIN and rate structures you already set up, so nothing gets re-entered and no model gets rebuilt from scratch.

  1. 01
    Discover
    Match & Qualify
  2. 02
    Capture
    Score & Decide
  3. 03
    Pricer
    Build & Defend
  4. 04
    Proposal
    Draft and submit
  5. 05
    Contract
    Track & Modify

Frequently asked questions

  • It reads your solicitation and organizes the requirements into discrete work packages, with the labor categories, materials, and ODCs each one calls for. You start with a structured cost build instead of a blank spreadsheet.

  • Pricer estimates the labor categories and hours across the period of performance as a starting point. Every assignment and every hour is editable, so you review and adjust before anything goes into a proposal.

  • Through one formula with no hidden logic: your direct rate times the allocated hours, plus your wrap rate, equals the cost to the government. Profit and fee are kept separate at this stage to stay compliant with federal cost accounting rules.

  • Yes. Every figure in the Basis of Estimates traces back to a specific work package, and every work package traces back to a section of the solicitation.

  • Yes. It infers materials the work implies but the solicitation never states, so a grounds-maintenance contract gets mowing equipment added for you. Inferred items stay editable, so you can confirm or remove them.

  • Your work breakdown, hours, and rates feed into the CLIN and rate structures already in GovDash. Pricing connects to capture, proposal, and contracts in the same platform, with no duplicate entry.

  • Pricing leads run the workbook. Capture, proposal, contracts, and leadership review the same pricing logic through stakeholder-safe briefs. Pricer is built for your whole proposal team, not just the pricing function.

  • Yes. The Insights dashboard exposes the logic of the price (labor mix, risk, strategy) without exposing underlying rates or wrap math. Permissions are role-based.

  • Yes. Pricer generates pricing strategy briefs, staffing tables, and risk assessments with one click. Those artifacts move directly into the proposal and capture workspaces inside GovDash.

  • ProPricer is built for the pricing function. GovDash Pricer is built for the pricing function and the rest of the proposal team. Pricing teams keep the workbook. Capture, proposal, and leadership get a stakeholder-safe view of the same logic.

See Pricer build a cost estimate on a real solicitation.

Spend 30 minutes with a GovDash pricing expert. Bring a solicitation you are working on and we will build the work breakdown, allocate the hours, and produce the cost estimate with you, live.